Concrete Mix Calculator (M10–M35 Cement, Sand, Aggregate & RMC) — Parth Enterprises
IS 456 / IS 10262 Verified • Live 2026 India Market Rates

Concrete Mix Calculator India (M10–M35 & RMC Cost)

Calculate exact 50 kg cement bags, coarse sand (cft/m³), 20mm & 10mm angular stone aggregate, mixing water, and transit-mixer Ready-Mix Concrete (RMC) cost for slabs, footings, columns, and pavements.

PARTH ENTERPRISES — COMMERCIAL CIVIL & INTERIOR ENGINEERING GSTIN: 07JJWPK3062E1ZT | MSME: UDYAM-DL-01-0043489 | E-378, Inderpuri, New Delhi – 110012
PRELIMINARY IS-1200 BOQ ESTIMATE
Date: 04 Nov 2026 | +91 9205618348
Enter Your Target Budget (₹) — Auto-Calculate Scope
Live IS-1200 Reverse Solver
₹ ₹0
Quick Scenarios:
1 Select Price Tier & Material Grade ₹4,600 – ₹6,600 / m³
2 Dimensions, Scope & Engineering Specs IS 456
5" = 0.42 ft • 6" = 0.50 ft • 150mm = 0.15 m
3 Customize Live Unit Market Rates & GST Editable ₹ Rates

Pre-loaded with verified 2026 Delhi NCR commercial rates. Edit any unit price below and your total BOQ auto-updates immediately:

₹/m³
₹/Bag
₹/cft
₹/cft
CALCULATING LIVE BOQ...
₹0
Adjust dimensions, tier, or unit prices to update instantly
IS-1200
Primary Engineering Quantity —
100% Top Share
Same Scope Across Price Tiers (Click to Switch)

Itemized Material & Execution BOQ Schedule

Auto-updates according to selected price tier, city rate index & custom unit prices
BOQ Work Item & Technical Specification Cost Share Estimated Qty Unit Rate Line Amount
Total Estimated Value ₹0

Why Civil Engineers Multiply Wet Concrete Volume by 1.54 (IS 456 Dry Volume Method)

Deterministic Engineering Equation (IS 456 / IS 10262)

Dry Volume = Wet Volume (m³) × 1.54 | Cement Bags (50 kg) = [Dry Volume × (Cement Part ÷ Sum of Ratio)] ÷ 0.03472

Loose dry sand and crushed angular stone aggregate contain ~35% air voids. When water and cement paste lubricate the mix and mechanical needle vibrators consolidate the pour, fine particles fill the voids between coarse aggregates—shrinking total volume by ~35%. Hence 1.00 m³ of compacted wet concrete requires 1.54 m³ of dry loose ingredients. One 50 kg bag of OPC cement (bulk density 1,440 kg/m³) occupies 50 ÷ 1,440 = 0.03472 m³ (1.226 cft).

1 Cubic Meter (1 m³) Concrete Material Consumption & 2026 Delhi NCR RMC Rates

Use the verified 2026 commercial procurement and site-execution benchmarks below when reviewing contractor quotations across Noida, Greater Noida, Gurugram, New Delhi, Faridabad, and major Indian metros:

Specification / Grade Governing Standard 2026 Benchmark Rate / Constant Engineering Application & QA Hold-Point
M10 PCC (1 : 3 : 6) IS 456 Lean Mix 4.5 Bags Cement • 16.3 cft Sand • 32.6 cft Agg
RMC ~₹4,450–₹4,750/m³ | Sub-base levelling course under footings & rafts.
M15 PCC (1 : 2 : 4) IS 456 Plain Concrete 6.4 Bags Cement • 15.5 cft Sand • 31.0 cft Agg
RMC ~₹4,850–₹5,150/m³ | Grade-slab sub-bases, kerb bedding & encasement.
M20 RCC (1 : 1.5 : 3) IS 456 Table 5 Min RCC 8.1 Bags Cement • 14.8 cft Sand • 29.6 cft Agg
RMC ~₹5,300–₹5,650/m³ | Residential slabs, lintels, staircases & light beams.
M25 RCC (1 : 1 : 2 / Design) IS 10262 Design Mix 8.5–11.0 Bags (Nominal vs Admixture Design)
RMC ~₹5,700–₹6,150/m³ | Commercial columns, footings, shear walls & podiums.
M30 – M35 High-Grade RCC IS 10262 + PCE Superplasticizer 380–430 kg/m³ Cementitious • W/C ≤ 0.42
RMC ~₹6,200–₹6,950/m³ | Pumped commercial floorplates, pile caps & basement walls.

Planning a Real Project in Noida, Greater Noida, Gurugram or New Delhi?

Parth Enterprises self-performs this trade directly with in-house civil supervisors, laser datum instrumentation, and GST-registered commercial billing (GSTIN: 07JJWPK3062E1ZT). Inspect our dedicated execution specifications here:

Explore RCC & Structural Concrete Contractor in Noida & Delhi NCR →
PARTH ENTERPRISES BOQ-TO-SITE EXECUTION PROTOCOL

From Instant Online Estimate to Audited Site Delivery

How we convert preliminary calculator quantities into fixed-rate, IS-1200 verified turnkey delivery across Delhi NCR

STAGE 01INSTANT

Preliminary BOQ Sizing

Compute baseline IS-code material quantities, wastage tolerances & 2026 India market budgets online and export your A4 PDF estimate.

Printable A4 BOQ Sheet
STAGE 0248–72 HRS

GFC Drawing & Site Survey

Share CAD/PDF drawings with our Engineering Desk for laser site measurement and itemized IS 1200 tender pricing.

Item-Rate Commercial Tender
STAGE 03EXECUTION

4-Gate Quality Verification

In-house self-performing crews execute works with NABL cube testing, MTC steel checks, 48-hr flood tests & laser tolerances.

Signed QA/QC Pour & Test Logs
STAGE 04HANDOVER

JMS & GST Audit Closeout

Transparent Joint Measurement Sheets (JMS), as-built CAD records, warranty certificates & GST-compliant tax invoicing.

Zero-Snag Handover Dossier

Frequently Asked Questions — Concrete Mix & RMC Calculator

How many bags of cement are required for 1 cubic meter (1 m³) of M20 concrete?
For nominal 1:1.5:3 M20 site-mixed concrete, Dry Volume = 1 × 1.54 = 1.54 m³. Cement volume = (1 ÷ 5.5) × 1.54 = 0.28 m³. Dividing by 0.03472 m³ per 50 kg bag gives 8.06 bags (rounded to 8 bags of cement), alongside ~14.8 cft of Zone-II sand and ~29.6 cft of graded 20mm/10mm aggregate.
Why should coarse aggregate be split 60:40 between 20mm and 10mm stone?
Using 20mm aggregate alone leaves honeycombing voids around congested TMT reinforcement bars, whereas using 10mm alone increases surface area and water demand. Blending 60% 20mm angular stone with 40% 10mm grit per IS 383 achieves maximum packing density and superior 28-day cube strength.
What is the minimum concrete grade allowed for RCC structural works in India?
Under IS 456:2000 Clause 6.1 and Table 5, M20 is the absolute minimum grade permitted for reinforced cement concrete (RCC) under mild exposure, while M25 to M35 is standard for commercial structures and moderate-to-severe environmental exposure across Delhi NCR.
When is Ready-Mix Concrete (RMC) better than site-mixed hopper concrete?
For any structural pour exceeding 12 to 15 m³ (roughly one 6-cubic-meter transit mixer × 2 loads) or grades M25 and above, automated weigh-batched plant RMC with PCE superplasticizers guarantees uniform W/C ratio, rapid boom-pump placement, and certified 7-day/28-day NABL cube crush compliance.
How many concrete test cubes must be sampled during a slab pour per IS 456?
IS 456 Clause 15.2.2 specifies 1 sample (set of 6 cubes: 3 tested at 7 days and 3 at 28 days) for 1–5 m³, 2 samples for 6–15 m³, 3 samples for 16–30 m³, 4 samples for 31–50 m³, and 4 plus 1 additional sample for every extra 50 m³ of concrete poured.
How many days of water curing are mandatory after pouring an RCC slab?
Under IS 456 Clause 13.5, exposed concrete surfaces made with Ordinary Portland Cement (OPC) must be kept continuously ponded or moist-cured for a minimum of 7 days, and at least 10 to 14 days when blended Portland Pozzolana Cement (PPC) or GGBS is used.
VENDOR EMPANELMENT & TENDER PRE-QUALIFICATION DESK

Convert Your Preliminary Estimate Into an Audited IS-1200 Contractor BOQ

Parth Enterprises executes direct self-performed civil structures, masonry, Italian marble, stone cladding, multi-tier waterproofing, and corporate interior fit-outs across Noida, Greater Noida, Gurugram & New Delhi—eliminating middleman contractor markups.

GSTIN: 07JJWPK3062E1ZT MSME: UDYAM-DL-01-0043489 PAN: JJWPK3062E BOQ Turnaround: 48–72 Hrs Tenure: 10+ Yrs Field Execution

Need Turnkey Civil or Interior Contracting Across Noida, Gurugram & Delhi NCR?

Partner directly with Parth Enterprises for IS-compliant RCC structures, brickwork, stone cladding, Italian marble crystallization, waterproofing, and corporate fit-outs.

IS 456 & IS 1200 Compliant
10+ Years Direct Field Execution
11 Core Trades Self-Performed In-House
GSTIN 07JJWPK3062E1ZT (Govt Registered)
Call 9205618348 WhatsApp RFQ